Aluminium Access Ramps
PROJECT OVERVIEW
Perfect Fabrications designed and manufactured a batch of 50 aluminium access ramps within a demanding two-week production schedule. The project demonstrates efficient batch production, repeatability, accurate component manufacture and the ability to complete large orders within short timeframes.
KEY FACTS
- 50 ramps manufactured
- 1.5 tonnes of aluminium processed
- 1,200 metres of CNC cutting path
- 1,000 press brake bends
- 81 metres of welding
- Completed in two weeks
FROM DRAWING TO FINISHED PRODUCT
How the project was delivered
Project Requirements
A full batch of 50 aluminium access ramps was required within a two-week production schedule. The ramps had to be manufactured consistently and to a repeatable standard across the whole order.
Our Approach
Each ramp incorporated interlocking internal reinforcing ribs, CNC-cut components, precision press brake bending and welded assembly.
Completed Result
All 50 ramps were completed within the two-week timescale. Every ramp was manufactured to the same repeatable standard, with consistent CNC-cut components, precise press brake bending and welded assembly, showing how we deliver large batch orders quickly without compromising manufacturing quality.
PROJECT GALLERY
Project photographs
SERVICES USED
MORE FROM OUR WORKSHOP
Related projects
GET IN TOUCH
Have a Project in Mind?
From one-off bespoke fabrications to repeat manufacturing contracts, we'd be pleased to discuss your requirements.


